Do sewers clean up the groundwater right away? USGS watches a Falmouth neighborhood switch off its septic systems

Research Library

The short version

Between 2017 and 2019, Falmouth connected about 1,400 properties around Little Pond, including the densely built Maravista peninsula, to the town sewer system. The US Geological Survey, working with EPA’s Southeast New England Program, drilled a network of monitoring wells beneath about 230 of those homes to see how fast the groundwater would recover. Before sewering, nitrate reached 26.2 mg of nitrogen per liter, well above the drinking-water limit of 10. By 2019 there were early signs of improvement in part of the aquifer, but no clear drop in the amount of nitrate flowing toward the pond. Groundwater on the peninsula takes roughly 8 to 10 years to reach the pond along shallow paths, so the full benefit will arrive slowly.

What the report covers

The study area is a block about 500 m by 500 m on the Maravista peninsula, between Little Pond and Great Pond in East Falmouth, where homes sit on small lots of 500 to 1,000 square meters and previously used cesspools and septic systems.

  • USGS installed 14 sites with multilevel samplers that draw water from many depths, plus a reference site in another densely developed coastal neighborhood that was not being sewered.
  • The wells were sampled 11 times from June 2016 to September 2019, covering the period before connections began and the transition as homes were hooked up.
  • The team measured nitrate and other signs of wastewater, mapped groundwater flow and the depth of fresh water, and estimated how much nitrate was moving toward Little Pond.

What they found

  • Heavily polluted groundwater. Across 749 samples, nitrate averaged 5.1 mg/L as nitrogen and reached 26.2 mg/L. Nitrate topped the 10 mg/L drinking-water limit at 9 of the 14 sites and at the reference site. The highest levels were usually in the deeper half of the fresh groundwater.
  • Early improvement in one layer. At depths of about 1 to 3.4 m below the water table, nitrate fell by about 0.76 mg/L per year and dissolved oxygen rose over the three years, a statistically significant change. Other depths showed no significant trend yet.
  • Mixed results site by site. At one closely watched site, average nitrate fell about 70% between June 2017 and September 2019. At another it rose about 17% over the same period, depending on when the homes uphill of each well were connected.
  • No clear drop at the pond’s edge yet. Nitrate moving through a 500 m stretch upgradient of Little Pond, about 15% of its shoreline, was estimated at 124 to 193 kg per year across the four main sampling rounds, with no clear decline. The authors say the cleaner water had likely not reached that line yet.
  • Recovery takes years. Groundwater travel time from the middle of the peninsula to Little Pond was estimated at 7.8 to 9.7 years along shallow paths, and longer along deeper ones. Leftover nitrogen in the soil, nitrogen arriving from farther inland, and fertilizer and stormwater can slow the improvement.

What it means for Waquoit Bay today

Little Pond lies in a neighboring watershed, just a few miles west, on the same sandy aquifer, with the same kind of dense, septic-served shoreline neighborhoods. This is one of the most direct looks at what happens underground after a Cape Cod neighborhood is sewered. The message is that sewering works, but the bay will not see the benefit right away: nitrogen already in the groundwater keeps flowing toward the shore for years. The report expects water quality to continue to improve gradually (McCobb et al., 2021).

For Waquoit Bay, where Falmouth and Mashpee are planning sewers and other nitrogen cuts, this lag is a reason to start sooner rather than later and to keep monitoring long enough to see results. It matches the EPA modeling of legacy nitrogen still traveling toward Cape Cod’s bays and the earlier USGS model of how fast sewering would help Popponesset Bay.

Read the report

McCobb, T. D., Barbaro, J. R., LeBlanc, D. R., & Belaval, M. (2021). Evaluating the effects of replacing septic systems with municipal sewers on groundwater quality in a densely developed coastal neighborhood, Falmouth, Massachusetts, 2016–19 (U.S. Geological Survey Scientific Investigations Report 2021–5130). https://doi.org/10.3133/sir20215130

License: This is a US federal government report, prepared by the US Geological Survey in cooperation with EPA’s Southeast New England Program, and is in the public domain. The PDF below is reproduced unmodified from USGS. The card image is the report’s cover page (public domain, US Government work).

Drafted with AI assistance from the linked source.