Red Brook runs along the Mashpee–Falmouth line into Hamblin Pond, at the head of Waquoit Bay. Where it crosses Red Brook Road, an old earthen dam and a five-foot pipe, built to flood cranberry bogs, block fish and hold back a stagnant pond. In 2022 the state’s Division of Ecological Restoration hired Horsley Witten Group to study replacing it. The engineers found the dam in poor condition and showed that swapping the pipe for an 8-by-8-foot box culvert, with no water-control gate, would let fish through, let the brook find its old channel and make the road more resilient to flooding and sea level rise.

What the report covers

The study was prepared for the Division of Ecological Restoration with the Towns of Mashpee and Falmouth as partners. The engineers visited the site in March 2022, after the town removed sandbags that had been holding the pond up.

  • They surveyed the dam, the pond and its sediment, and sampled the sediment for contaminants.
  • They logged water levels above and below the road and measured flows to see how far the tide reaches.
  • They modeled what would happen to water levels, sediment and fish passage if the dam were removed, and drew a preliminary (about 30%) design with a cost estimate.

What it found

  • The dam is failing. A December 2020 state dam safety inspection rated it in poor condition, noting seepage, erosion, animal burrows up to three feet deep, cracking in the road and likely undermining of the old sluice gate. The wooden stop logs rotted out in June 2021.
  • It is the lowest major barrier on the brook. Red Brook Road is the first significant obstacle for fish coming up from Hamblin Pond, one of ten bog-era structures along the brook. The pipe does not meet the state’s stream crossing standards.
  • The pond is a flooded bog. The impoundment covers about six acres, with soft sediment from six inches to seven feet deep in the old bog channels. Bogs below the road were abandoned by 1971; those above it, probably by the early 1990s.
  • Old farm pesticides are in the mud. Samples held DDT and its breakdown products, chlordane, dieldrin and other pesticides above ecological screening levels, as expected from decades of bog farming. The engineers judged the sediment broadly similar above and below the dam and likely suitable to release downstream, subject to MassDEP review during permitting.
  • The tide already reaches the road. With the stop logs gone, the pipe barely restricts the tide, and a small tidal rise already reaches above the road on spring tides. That reach will grow as seas rise.
  • Removing the dam works for fish. Taking out the control structure would drop the pond about three feet at normal flows once sediment settles, and the model found no velocities that would stop alewife or brook trout. About 300 cubic yards of sediment would move downstream.
  • Keep the road, replace the pipe. Removing the embankment isn’t practical because Red Brook Road is a key local connection. Instead the plan replaces the pipe with an 8-by-8-foot concrete box culvert and raises the road about a foot over 125 feet. The study estimated about $366,000 for construction, including a 30% contingency, and $470,000–605,000 for the whole project through design, permitting and monitoring, in 2022 dollars.

What it means for Waquoit Bay today

Red Brook is one of the Bay’s smaller tributaries, but it sits next to the Quashnet, home of the Cape’s sea-run brook trout, and it runs through 23 acres of former bogs that could become wetland again. Opening the road crossing is the first step: the report lists next steps that include removing the other berms and culverts and restoring the brook channel and the old bogs. A bigger opening also gives salt marsh room to move upstream as the sea rises.

CPWB weighed in early: in April 2022, while this study was under way, CPWB wrote to Falmouth and Mashpee conservation, public works and water quality officials urging that whatever fix they chose for the failed dam should also cut the nutrients flowing into Hamblin Pond, for example with restored wetlands designed to absorb them. The project has moved on since. In 2024 the Association to Preserve Cape Cod won a federal grant that includes Red Brook (our news summary). By 2025 the replacement was budgeted at about $2.2 million (our news summary), and in September 2026 Mashpee’s Conservation Commission approved a larger design, a culvert 10 feet wide and 8 feet high with sand filters for road runoff (our news summary).

Read the report

Horsley Witten Group. (2022). Red Brook Culvert Replacement and Restoration Feasibility Study, Mashpee and Falmouth, Massachusetts. Prepared for the Massachusetts Division of Ecological Restoration, June 2022 (revised July 2022).

License: A planning study prepared for a state agency; no license is stated. We share the 46-page main report here, compressed for the web. The attachments (supplemental application materials including parcel ownership maps, the preliminary design plans, laboratory results and the cost estimate sheet) are not included.