From the Falmouth Enterprise · November 12, 2026 · By Katie Nelson
The Enterprise reports that nearly six inches of rain fell in a six-hour period on Friday, November 6, flooding roads across Falmouth. At times, parts of Route 28, East Main Street and Palmer Avenue could not be driven because of standing water. During the storm, Justin "JJ" Adams, a 6-year-old Mullen-Hall School student, went outside with a stick and moved leaves and other debris away from storm drains so the water collecting in the street could flow. One of the drains he cleared is near the end of the police department driveway off Dillingham Avenue. This week the Falmouth Police Patrol Federation and Chief Jeffrey A. Lourie recognized him with a new rake, police department merchandise and a Chief's Award Challenge Coin. His mother, Melissa Johnson, told the Enterprise that when JJ got the rake, he called it the "best day ever."
CPWB extends a big thank you and congratulations to JJ! CPWB's Storm Drain Adoption project empowers neighbors to take on the same job JJ did on his own. Volunteers adopt a drain near home, visit it about once a year and after heavy rain, clear away debris or trash, measure the sediment in the basin and log what they find. The Enterprise reported in June that CPWB's website map shows 1,680 drains in the Waquoit Bay watershed between Mashpee and Falmouth. Storm drain basins collect polluted water and fill gradually with sediment, leaf debris and litter, so they need periodic pumping. If JJ's example has you looking at the drain on your own street, you can adopt it at drains.waquoitbay.org.
This is CPWB’s summary of a news article. The full article and its photos are published by the Falmouth Enterprise.
Drafted with AI assistance from the linked source.
Related project: Storm Drain Adoption → · All 2 posts on this project →


