← News

Falmouth requires nitrogen-reducing septic systems for new construction

News

From the Falmouth Enterprise · October 23, 2025 · By Katie Nelson

On October 20, 2025, after about a year of drafting, Falmouth’s Board of Health voted unanimously to require the best available nitrogen-reducing septic technology whenever new construction or a flow increase occurs in the town’s nitrogen-regulated areas. Those areas include MassDEP’s nitrogen-sensitive areas and other waters on the state’s impaired list, and after a September hearing the board added Great Sippewissett Marsh and the drinking water protection district.

New construction in future sewer areas is exempt only if sewer design funding is already secured when permits are issued. The rules took effect November 15, 2025, and board members expect to revisit them often as watershed plans and sewer areas take shape. Because Waquoit Bay is nitrogen-impaired, the rules apply to new building in Falmouth’s part of its watershed.

Read the full story in the Falmouth Enterprise: “Health Board Adopts Stricter Septic Regulations Aimed At Reducing Nitrogen In Waterways” →

This is CPWB’s summary of a news article. The full article and its photos are published by the Falmouth Enterprise.

Drafted with AI assistance from the linked source.