The Town of Falmouth's two-page fact sheet explains why it plans an ocean outfall: a pipe to carry tertiary treated wastewater into Nantucket Sound. The Town says sewering densely developed south coast areas, treating the wastewater and discharging it offshore will improve coastal pond water quality by reducing nitrogen from septic systems, avoid the impacts of discharging treated water to land, and decrease nitrogen discharged to Nantucket Sound. The Town says the outfall would be about 2,300 feet offshore and that eelgrass surveys put the meadows' deepwater edge at least 700 feet inshore of it. These are the Town's own statements about a proposed project.
What the report covers
The fact sheet is the Town's account of the project, and it makes these points.
- It says Falmouth's coastal ponds are severely degraded and that the outfall is meant to restore them by cutting nitrogen loading from septic systems.
- It gives the design: an average annual capacity of 3 million gallons per day, an average annual discharge at start of under 0.71 million gallons per day, and an outfall about 2,300 feet offshore in about 20 feet of water.
- It argues that the discharge site, with strong east-west tidal velocity, would mix and dilute the water quickly and keep it from returning toward the ponds and shoreline.
- It says eelgrass surveys in 2024 and 2025 place the deepwater edge of the meadows well inshore of the outfall.
- It describes the construction plan and says impacts would be temporary.
What it found
- Sewers expand, discharge to ground stops. The Town says that once the outfall is available, it will stop regular discharge to ground at the Falmouth wastewater treatment facility. It will expand sewer areas to meet nitrogen load limits for coastal ponds, together with targeted use of nitrogen-reducing septic systems and other nitrogen management strategies. The Town says future sewers will focus on the most densely developed areas closest to the ponds along the south coast.
- Tertiary treatment with disinfection. The Town says the outfall will discharge only tertiary treated wastewater with ultraviolet disinfection. It contrasts this with outfalls that have historically discharged secondary or even only primary treated wastewater. It also says Falmouth has no combined sewers, so the Town would have no treatment "bypass" events during storms.
- Rapid mixing expected. According to the Town, the discharge area has strong east-west tidal velocity that would provide rapid mixing and dilution, and a diffuser assembly would add to dilution and dispersion. The Town says this tidal velocity exceeds that of any other outfall location in Massachusetts.
- Eelgrass edge at least 700 feet inshore. The Town reports that multiple eelgrass surveys in 2024 and 2025 show the deepwater edge of eelgrass meadows is at least 700 feet north (inshore) of the proposed outfall location. It says horizontal directional drilling from Kite Park is meant to avoid disruption to eelgrass beds, beaches and other coastal resources.
- Temporary construction impacts. The Town says construction impacts will be temporary and mostly confined to existing road rights-of-way and a portion of Kite Park, and that disturbed areas will be restored. It says no permanent above grade or at grade structures will be installed in Kite Park, and that directional drilling there will not take place from Memorial Day to Labor Day.
What it means for Waquoit Bay today
This is the Town of Falmouth's own description of a project that its wastewater plans lean on. The fact sheet pairs two photos under the statement that Falmouth's coastal ponds are severely degraded, one labeled Waquoit Bay, May 2025. CPWB's overview of the Bay says wastewater, mostly from septic systems, is the largest source of nitrogen that people can control there, which is the same source the Town says its sewer expansion targets.
Eelgrass is also at the center of the Town's case: it says the outfall sits beyond the meadows. A USGS model of Falmouth examined what sewering and offshore discharge could mean for groundwater, and a Select Board presentation on capacity at the Main treatment plant shows how the plant's limits figure in the Town's planning.
Read the report
Town of Falmouth. (2026). *Falmouth ocean outfall: A water quality improvement project* [Project fact sheet]. https://www.falmouthma.gov/DocumentCenter/View/22062/Falmouth-Ocean-Outfall—Fact-Sheet?bidId=
License: The fact sheet is a Town of Falmouth document with no open license stated, so we link to the Town's copy and do not host the PDF. The card image is a title card made from the citation.
Drafted with AI assistance from the linked source.