The short version
At a July 15, 2026 public meeting, Falmouth Wastewater Superintendent Amy Lowell and Anastasia Rudenko of GHD Inc. presented the town's plan for an ocean outfall: a pipe carrying treated wastewater from the main treatment facility to Nantucket Sound. The slides give the town's reasons for the project, its design, its cost estimates, and the findings of its draft environmental impact report, which the town submitted to the state on June 30, 2026. The town's evaluation concluded the discharge would not degrade water quality and, because it would let sewers expand, would decrease nitrogen discharged to the Sound by at least 12,000 kg/year. These are the town's and its consultants' conclusions. This summary is based on the presentation slides, not the full report.
What the report covers
The town says sewer expansion has been limited by where treated wastewater can go, and that an outfall to Nantucket Sound would provide the discharge capacity to allow expansion; its studies are these.
- A two-year baseline water quality monitoring program measured dissolved oxygen, temperature, salinity, pH, water clarity and nutrients at sites in Nantucket Sound.
- Hydrodynamic modeling by Dr. James Churchill of WHOI examined currents and mixing at the outfall site.
- Eelgrass and benthic (seafloor) surveys by Dr. Scott Gallagher of CoastalOceanVision, Inc. used remotely controlled vehicle photos and video, divers and drop cameras.
- A USGS model examined how the outfall project would affect the aquifer.
- An antidegradation evaluation, scoped with DEP, EPA and CZM, used the baseline data and the modeling to test whether the discharge would degrade surface water quality.
What it found
- Discharge capacity has held sewers back. The presentation says Falmouth's sewer expansion has been limited by treated wastewater discharge capacity. Since 2007, 25 potential land-based sites have been evaluated, and the Select Board voted in 2022 to plan and permit an outfall for all future discharge from the main treatment facility.
- Sewers and new septic systems are both needed. The town says 89% of properties in Falmouth still have septic systems, and that nitrogen-reducing septic systems alone cannot remove enough nitrogen to meet the requirements for some coastal ponds. It says sewering is required in the most densely developed areas closest to the ponds with the highest nitrogen removal requirements.
- A 6-mile pipe and a drilled outfall. Treated effluent would travel 6 miles from the treatment facility to Kite Park within existing road right of ways. The pipe would then be drilled to a discharge point about 2,300 feet offshore in Nantucket Sound, at about the 20-foot water depth contour, beyond eelgrass. The outfall is designed for a future average flow of 3,000,000 gallons per day, with discharge beginning at less than 710,000 gallons per day average annual flow.
- Strong tides and fast dilution (model result). In the town's hydrodynamic modeling, Nantucket Sound currents are dominated by strong east-west tidal flows, and a dilution of 1000:1 is achieved within a few hundred feet of the discharge point. The modeling concluded that the outfall's nutrient contribution would not be distinguishable from natural variability in the Sound.
- An eelgrass buffer. The eelgrass surveys found the deep-water edge of the meadows is at least 250 meters north (inshore) of the planned outfall. The presentation says the discharge is not anticipated to affect water clarity or increase nutrient concentrations at the meadows.
- No degradation, and a net nitrogen cut (town's evaluation). The antidegradation evaluation concluded the proposed discharge will not degrade water quality under any of the criteria in the surface water quality standards. It also concluded that sewering densely developed areas, treating the wastewater and discharging to the outfall will decrease nitrogen discharged to Nantucket Sound by at least 12,000 kg/year.
- Small aquifer effects (USGS model). The presentation says a USGS report noted the decrease in water returned to the land would be a small percentage of total recharge over the study area. It says the USGS concluded the response of the water table and streamflow would be relatively small compared with fluctuation from natural recharge.
- Estimated costs and votes ahead. The town estimates $7 million for design and $80 million for construction, with Town Meeting appropriations in April 2027 and April 2028, each followed by a debt exclusion ballot question in May. The design tax impact is given as $16 to $24 per year for a $791,800 median single family home. The construction tax impact is still to be determined and depends on whether the town adopts a Water Infrastructure Investment Fund, a state 0% interest funding commitment, and Cape & Islands Water Protection Fund loan forgiveness of up to 25%.
What it means for Waquoit Bay today
The presentation makes its case for the outfall with photos of degraded water, one of them Waquoit Bay in May 2025, and says many of Falmouth's coastal ponds are severely degraded, primarily by nitrogen from septic systems. The outfall is the town's answer to where treated wastewater would go as sewers grow: once it is available, the town says it will stop regular discharge to ground at the main treatment facility and expand sewer areas to meet the nitrogen limits for coastal ponds. A draft watershed plan, due by the end of 2026, is to define sewer areas, nitrogen-removing septic system areas and other strategies for each nitrogen-sensitive watershed.
Which areas are sewered, and in what order, will decide how soon the outfall helps Waquoit Bay. CPWB's position is that the town should start on Waquoit Bay first once the pipe is running (see CPWB's request to Falmouth's Water Quality Management Committee). For the groundwater question the presentation raises, see how a USGS model of Falmouth's aquifer tested sewering and offshore discharge.
See the presentation
Lowell, A., & Rudenko, A. (2026, July 15). *Falmouth's outfall project and draft environmental impact report* [Public information meeting presentation]. Town of Falmouth and GHD Inc. https://www.falmouthma.gov/DocumentCenter/View/21782/Outfall-Presentation-Public-Meeting-7-10-26—final-1
License: a Town of Falmouth presentation with no open license stated, so we link to the town's copy and do not host a PDF. The card image is a title card made from the citation.